你现在的位置:首页>企业动态

双组份打胶机换桶的操作细节

浏览:0
使用过双组份打胶机的朋友都知道,双组份打胶机的胶是密封存放在胶桶中的,胶用完了需要更换新的桶装胶才能继续使用。今天济南双组份打胶机厂家给大家讲解下更换胶桶的操作。
As all friends who have used the two-component sealant dispenser know, the sealant of the two-component sealant dispenser is sealed and stored in a plastic barrel. When the sealant is used up, you need to replace it with a new barrel of sealant before continuing to use it. Today, the manufacturer of the two-component sealant dispenser in Jinan explained the operation of replacing the glue bucket.
当胶桶中的胶水用完时,设备的三色指示灯会亮红灯且报警(胶水检测报警),此时应该更换胶桶。具体步骤如下:
When the glue in the glue bucket is used up, the three color indicator light of the equipment will be red and give an alarm (glue detection alarm). At this time, the glue bucket should be replaced. The specific steps are as follows:
1、先在触摸屏上点击“胶泵停止”,及时关掉齿轮泵;
1. First click "glue pump stop" on the touch screen to turn off the gear pump in time;
2、关闭排气阀,按住触摸屏上的“上升”按钮2秒,让压盘下边粘的PUR热熔胶及时脱落,不于在上升过程中从排气阀溢出流在压盘上面;
2. Close the exhaust valve, press and hold the "Up" button on the touch screen for 2 seconds, so that the PUR hot melt adhesive stuck under the pressure plate can fall off in time, so as not to overflow from the exhaust valve and flow onto the pressure plate during the rising process;
3、打开排气阀,继续按“上升”按钮,此时PUR热熔胶机的加热压盘会缓缓上升,待一个密封圈脱离胶桶口后松开“上升”按钮,利用惯性让压盘慢慢脱桶,脱桶后可轻按“上升”按钮将压盘上升到上极限位置;
3. Open the exhaust valve and continue to press the "Up" button. At this time, the heating pressure plate of PUR hot-melt adhesive machine will rise slowly. After a sealing ring is separated from the opening of the glue bucket, release the "Up" button. Use inertia to let the pressure plate slowly release the bucket. After the bucket is removed, gently press the "Up" button to raise the pressure plate to the upper limit position;
济南双组份打胶机
4、将密封圈上的残胶清理下,置换新的胶桶。
4. Clean the residual rubber on the sealing ring and replace it with a new rubber bucket.
当胶桶内的胶用完时,应立即关闭A、B开关,停止打胶。打开A(或B)胶泵充气开关,选择A(或B)胶泵提升机构为上升位置,点动旋钮使压盘慢慢提起,此时应注意:胶桶尽量不要离开底盘,直压盘完全脱离胶桶时关闭A(或B)胶泵的充气开关。
When the glue in the glue bucket is used up, immediately turn off switches A and B to stop the glue application. Turn on the inflation switch of A (or B) rubber pump, select the lifting mechanism of A (or B) rubber pump as the rising position, and jog the knob to lift the pressure plate slowly. At this time, it should be noted that the rubber barrel should not leave the chassis as far as possible until the pressure plate is completely separated from the rubber barrel, and turn off the inflation switch of A (or B) rubber pump.
具体操作:将B泵关闭,打开B胶回流开关然后打开胶枪,胶条为白色即可。
Specific operation: Turn off pump B, turn on the return switch of glue B, and then turn on the glue gun until the glue strip is white.
以上就是双组份打胶机换桶的操作细节,您对此有什么需求可以随时来我们网站http://www.jntiannuo.com进行咨询了解,有关人员将竭诚为您服务!
The above is the operation details of changing barrels of two-component sealant dispenser. If you have any needs, you can come to our website at any time http://www.jntiannuo.com The relevant personnel will serve you wholeheartedly after consulting!

上一篇:双组份打胶机机头不在原位怎么调?
下一篇:打胶机设备平常使用中要进行定期检查

  • 微信