你现在的位置:首页>企业动态

自动打胶机的调整与操作!

浏览:0
  关于中空玻璃主动打胶机小编已经和大家说了很多,比如关于职业额发展、整体的现状,还有和中空玻璃相关职业的常识等等。但是小编发现很多的读者在私信小编时问的都是有关于中空玻璃主动打胶机的基础操作等相关问题。今天小编就和大家清清楚楚的说清楚关于中空玻璃主动打胶机的调整与操作的问题。
  The small edition of active gluing machine for hollow glass has already talked a lot with you, such as the development of occupation, the overall status quo, and the general knowledge of the occupation related to hollow glass, and so on. However, Xiaobian found that many readers in private trust Xiaobian asked about the basic operation of the hollow glass active gluing machine and other related issues. Today, Xiaobian and everyone clearly explained the adjustment and operation of the active gluing machine for hollow glass.
  操作流程:
  Operational procedures:
  1、 放在一个平整洁净的平面上,衔接电源和气源,两者承认接通之后就开始进行操作。
  1. Place it on a flat and clean surface, connect the power supply with the air supply, and both of them admit that the operation will begin after the connection.
  2、 打胶机中间会有一个混胶过程,在供胶机上面混胶完毕之后,需要在电子显示屏上控制面板上进行挑选“行走设置”。翻开界面之后按T1键行进行走。在机头停止时,翻开机头上面B胶阀门,接着在控制面板上找到Esc键返回主界面,然后F2状况设置,在翻开界面后按K3键供胶开始,当胶嘴中完全混合的胶流出按K4键完毕供胶。
  2. There will be a mixing process in the middle of the glue beater. After mixing is finished on the glue feeder, it is necessary to select "walking settings" on the control panel of the electronic display screen. Open the interface and press the T1 key to go. When the nose stops, turn on the B glue valve above the nose, then find Esc key on the control panel to return to the main interface, then set F2 status, press K3 key to start gluing after opening the interface, and press K4 key to finish gluing when the completely mixed glue out of the nozzle.
  3、 需要记住的是工作完毕之后或许在较长时刻不工作时,需要冲洗混胶设备,避免供胶管的堵塞,影响未来使用作用。
双组份打胶机
  3. It should be remembered that after the completion of the work, it is necessary to flush the mixing equipment to avoid the blockage of the rubber supply tube and affect the future use of the mixing equipment when it is not working for a long time.
  4、 调整环节:吸盘调整:涂胶机吸盘与旋转台的高度调整合适。
  4. Adjustment link: sucker adjustment: the height adjustment of sucker and rotary table is suitable.
  5、 气动开关、胶嘴、探针调整:将事先合好的中空玻璃放在旋转台上,靠近涂胶机工作面,然后中空玻璃推到定位上,调整胶嘴与玻璃的高度,使出胶嘴的出胶口中心语铝槽中心在同一个水平线上:胶嘴与玻璃之间的顶力合适:铝槽深度检测探针与出胶口中心线在一致水平线上。
  5. Pneumatic switch, glue nozzle and probe adjustment: place pre-assembled hollow glass on rotating table, close to glue machine working face, then push hollow glass to position, adjust the height of glue nozzle and glass, so that the center of aluminium groove of glue nozzle exit is on the same horizontal line: the top force between glue nozzle and glass is appropriate: aluminium groove depth detection probe and center line of glue outlet At the same level.
  6、 启动开关(机头的前端的光开关)与玻璃之间的检测间隔(1.5~2mm)。在控制面板上挑选“状况设置”,翻开状况设置后挑选“吸盘开(K5键)”,此时机头会往前移动,如果不往前移动则查看并调整启动开关的检测间隔。
  6. The detection interval between the startup switch (the optical switch at the front end of the nose) and the glass (1.5-2 mm). Select the "status setting" on the control panel and select the "sucker opening (K5 key)" after turning on the status setting. At this time, the nose will move forward. If it does not move forward, check and adjust the detection interval of the start switch.

上一篇:怎么清洗灌胶机?
下一篇:自动打胶机和手动打胶机哪个好?

  • 微信