双组份打胶机安装顺序是怎样的?

浏览:0
双组份打胶机安装顺序是怎样的?这一问题是很多人都想知道的,下面小编就来为您讲讲。
What is the installation sequence of two-component sealant dispenser? This is a question that many people want to know, and the following small compilation will tell you about it.
1、双组份打胶机设备应安装在干燥、无粉尘、无腐蚀性气体的坏境中(该要求与其他设备一致,当然如果条件达不到少争取无腐蚀性气体,毕竟设备中有电线以及管路这些配件抗腐蚀性不高)。
1. The two-component sealant dispenser equipment should be installed in a dry, dust-free and non corrosive environment (this requirement is the same as that of other equipment. Of course, if the conditions cannot be met, at least try to avoid corrosive gas. After all, there are wires and pipes in the equipment and these accessories have low corrosion resistance).
2、室内温度更好控制在10~40度的室内坚硬地面上,地面应水平度要好。(小编这里说的地面水平度要好不一定要非常的平整才行,我们的设备在设计之初已经考虑到了地面复杂性的因素所以对地面平整度是有相当大的忍让度的,只要不是幅度提别的大一般都可以正常工作。)
2. The indoor temperature should be better controlled on the hard indoor ground of 10~40 degrees, and the ground should be better leveled. (The ground levelness mentioned by Xiao Bian here should not be very smooth. Our equipment has taken the complexity of the ground into consideration at the beginning of design, so we have a great tolerance for the ground levelness. As long as it is not greatly improved, it can generally work normally.)
双组份打胶机
3、双组份打胶机安装之前,应先检查是否有因运输、搬动造成的变形、损坏和紧固件松动情况,之前就曾经有客户在移动打胶机的过程中把设备的智能控制系统的一个零部件碰掉了而导致设备无法正常运行,我们的工作人员到现场后才排查出的原因。
3. Before installing the two-component sealant dispenser, first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the sealant dispenser, causing the equipment to fail to operate normally. Our staff found out the reason after arriving at the site.
4、我们可以根据地面平整度的实际情况来通过调整设备的可升降地脚螺栓来调整设备的水平度直到设备水平而稳固。然后按图接线并可靠接地,把气源接入机器所配带的气源接口,确保无漏气现象。
4. First, we can adjust the levelness of the equipment according to the actual situation of the ground flatness by adjusting the lifting anchor bolts of the equipment until the equipment is horizontal and stable. Then connect the wires according to the diagram and connect the air source to the air source interface equipped with the machine to ensure that there is no air leakage.
5、向油槽中加注液压油指定位置,46#液压油(约为50升左右)。
5. Fill the oil tank with hydraulic oil to the designated position, 46 # hydraulic oil (about 50 liters).
6、接通电源并打开查看设备是否能够正常运行。
6. Turn on the power and check whether the device can operate normally.
以上就是问题的解答了,您对此有什么不明白的地方,可以随时来我们网站http://www.jntiannuo.com咨询!
The above is the answer to the question. If you don't understand anything about it, you can come to our website at any time http://www.jntiannuo.com consulting service