双组份打胶机安装的几点正确顺序
双组份打胶机是生产中空、幕墙玻璃的专用设备,可一次完成二道密封中A、B组份混合与涂胶。适用配比精度高的胶种,满足玻璃深加工企业率、高合格率流水线作业的生产需求,那么双组份打胶机安装的顺序是怎样的?一起来看一下吧。
The two-component gluing machine is a special equipment for the production of hollow and curtain wall glass, which can complete the mixing and gluing of components a and B in the secondary sealing at one time. It is applicable to the glue with high matching accuracy and meets the production requirements of high-efficiency and high pass rate assembly line operation of glass deep processing enterprises. What is the installation sequence of the two-component gluing machine? Let's have a look.
1、双组份打胶机设备应安装在干燥、无粉尘、无腐蚀性气体的坏境中(该要求与其他设备一致,当然如果条件达不到少争取无腐蚀性气体,毕竟设备中有电线以及管路这些配件抗腐蚀性不高)。
1. The two-component glue applicator equipment shall be installed in a dry, dust-free and corrosive gas free environment (this requirement is the same as that of other equipment. Of course, if the conditions are not met, at least strive for non corrosive gas. After all, the equipment has wires and pipes, and these accessories have low corrosion resistance).
2、室内温度更好控制在10~40度的室内坚硬地面上,地面应水平度要好。(小编这里说的地面水平度要好不一定要非常的平整才行,我们的设备在设计之初已经考虑到了地面复杂性的因素所以对地面平整度是有相当大的忍让度的,只要不是幅度提别的大一般都可以正常工作。)
2. The indoor temperature should be better controlled on the indoor hard ground of 10-40 degrees, and the ground should be level. (the ground levelness mentioned by the editor here does not have to be very flat. At the beginning of the design, our equipment has taken into account the complexity of the ground, so it has a great tolerance for the ground levelness. As long as the range is not increased, it can generally work normally.)
3、双组份打胶机安装之前,应先检查是否有因运输、搬动造成的变形、损坏和紧固件松动情况,之前就曾经有客户在移动打胶机的过程中把设备的智能控制系统的一个零部件碰掉了而导致设备无法正常运行,我们的工作人员到现场后才排查出的原因。
3. Before the installation of the two-component glue applicator, it is necessary to check whether there is deformation, damage and looseness of fasteners caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment during the process of moving the glue applicator, which caused the equipment to fail to operate normally. Our staff found out the reason after arriving at the site.
4、我们可以根据地面平整度的实际情况来通过调整设备的可升降地脚螺栓来调整设备的水平度直到设备水平而稳固。然后按图接线并可靠接地,把气源接入机器所配带的气源接口,确保无漏气现象。
4. First, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is horizontal and stable. Then connect the wires according to the drawing and reliably connect the air source to the air source interface provided by the machine to ensure no air leakage.
5、向油槽中加注液压油指定位置,46#液压油(约为50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46 # hydraulic oil (about 50L).
6、接通电源并打开查看设备是否能够正常运行。
6. Turn on the power and check whether the equipment can operate normally.
The correct installation sequence of the two-component gluing machine is the above six aspects. If you have any questions about this, please come to our website at any time http://www.jntiannuo.com Consult and understand!