你现在的位置:首页>企业动态

双组份打胶机的操作步骤

浏览:0
1、接通气源:

1, connect the gas source:
电源接通,调节减压阀0.4~0.6Mpa,检查系统有无漏气现象。然后试运行以下动作:(1)A泵提升;(2)A泵充气;(3)B泵提升;(4)B泵充气。注意:提升气缸提升时,如果两气缸不同步,请下降原点后重新操作。
The source is connected and the pressure relief valve is adjusted to 0.4~0.6Mpa to check the leakage of the system. Then try to run the following actions: (1) A pump lifting; (2) A pump inflated; (3) B pump lifting; (4) B pump inflated. Note: when lifting the cylinder, if the two cylinder is not synchronized, please drop back to the original point and re operate.
2、将A、B组份胶桶就位,并与A、B胶泵的轴线对中。

2, the A, B component glue barrel is in place, and the axis of A, B glue pump is in the center.

济南双组份打胶机

以A组份为例:
Take A as an example:
1)操作手动转阀,将A泵提升高,提升过程中观察各管路有无拉伸过紧处。
1) operate the manual transfer valve to elevate the A pump to the highest level.
2)将胶桶放置在A泵压胶盘下,开启胶桶,将其中塑料袋外翻桶外,胶面塑料片取出。
2) put the glue barrel under the A pump press disc, open the glue barrel, turn the plastic bag out to the bucket, and take the plastic sheet out.
3)使A泵压盘缓慢下降,压盘入桶时应使其与桶口对准,将压胶盘排气口打开,直到压盘接触胶面。待压盘内气体全部排放完并有少量胶从排气口溢出时,即可关闭排气阀。
3) slow down the pressure plate of the A pump, when the pressure plate enters the barrel, it should be aligned with the buckets, and the vent opening of the press disc is opened until the press disc is exposed to the rubber surface. The exhaust valve can be closed when the gas is completely discharged and a small amount of glue is spilled from the exhaust port.
4)开机试打胶:将主泵气源开关打开,按下胶枪开关,直A泵里空气排净枪口处出胶连续时停止。
4) open machine test glue: open the main pump gas switch, press the glue gun switch until the air in the A pump is discharged at the mouth of the gun and stops when the glue is continuous.
用同样的方法操作B泵。
Operate the B pump in the same way.
希望上述介绍对您有所帮助哦,我们以真诚贴近客户,以行动满足客户,以双赢保有客户,以个性客户,您的满意是我们大的追求。
I hope this introduction can help you. We sincerely close to customers, take actions to satisfy customers, win customers and personalities lead customers. Your satisfaction is our greatest pursuit.

上一篇:双组份打胶机的日常操作说明
下一篇:风力发电设备怎么运输

  • 微信