你现在的位置:首页>企业动态

双组份打胶机的操作步骤说明

浏览:0
双组份打胶机是生产中空、幕墙玻璃的专用设备,可一次完成二道密封中A、B组份混合与涂胶。适用配比精度高的胶种,满足玻璃深加工企业率、高合格率流水线作业的生产需求,是大规模生产好中空玻璃及玻璃幕墙产品的一种理想的配套设备。接下来小编简单介绍一下双组份打胶机的操作步骤:
The two-component gluing machine is a special equipment for the production of hollow and curtain wall glass, which can complete the mixing and gluing of a and B components in the secondary seal at one time. It is an ideal matching equipment for large-scale production of insulating glass and glass curtain wall products. Next, I will briefly introduce the operation steps of the two-component gluing machine
1、接通气源:源接通,调节减压阀0.4~0.6Mpa,检查系统有无漏气现象。然后试运行以下动作:(1)A泵提升;(2)A泵充气;(3)B泵提升;(4)B泵充气。注意:提升气缸提升时,如果两气缸不同步,请下降原点后重新操作。
1. Connect the air source: connect the source, adjust the pressure reducing valve to 0.4 ~ 0.6MPa, and check whether there is air leakage in the system. Then test run the following actions: (1) pump a is lifted; (2) pump a is inflated; (3) pump B is lifted; (4) pump B is inflated. Note: when lifting the lifting cylinder, if the two cylinders are not synchronized, please lower to the original point and then operate again.
2、将A、B组份胶桶就位,并与A、B胶泵的轴线对中。  以A组份为例:  1)操作手动转阀,将A泵提升,提升过程中观察各管路有无拉伸过紧处。  2)将胶桶放置在A泵压胶盘下,开启胶桶,将其中塑料袋外翻桶外,胶面塑料片取出。  3)使A泵压盘缓慢下降,压盘入桶时应使其与桶口对准,将压胶盘排气口打开,直到压盘接触胶面。待压盘内气体全部排放完并有少量胶从排气口溢出时,即可关闭排气阀。(提升开关保持下压状态)  4)开机试打胶:将主泵气源开关打开,按下胶枪开关,直A泵里空气排净枪口处出胶连续时停止。  用同样的方法操作B泵。
2. Put component A and component B in place and align with the axis of a and B glue pump. Take component A as an example: 1) operate the manual rotary valve to lift the pump a to the maximum, and observe whether there is over tension in each pipeline during the lifting process. 2) Place the rubber barrel under the pressure plate of pump a, open the barrel, turn the plastic bag out of the barrel, and take out the plastic sheet on the plastic surface. 3) Lower the pressure plate of pump a slowly, align the pressure plate with the barrel mouth when entering the barrel, and open the exhaust port of the pressure plate until the pressure plate contacts the rubber surface. When the gas in the pressure plate is completely discharged and a small amount of glue overflows from the exhaust port, the exhaust valve can be closed. (the lifting switch is kept in the down pressure state) 4) start up and try to apply glue: turn on the air source switch of the main pump and press the glue gun switch until the air in pump a is exhausted completely, and the glue is continuously discharged from the muzzle. Operate pump B in the same way.

济南双组份打胶机
3、打胶操作:1)松开比例杠杆上的比例泵锁紧螺钉,将比例泵内外调整所需比例。只有当A胶和B胶的配比达到正常值时,才可进行下面的操作。  2)置选择旋钮于A、B泵开,将胶枪出口对准两片玻璃的中缝,打开胶枪开关,以适当速度平稳地移动胶枪使玻璃槽内的双组份胶填满充实为佳。打胶结束时关闭胶枪。
3. Glue operation: 1) loosen the locking screw of the proportional pump on the proportional lever, and adjust the internal and external of the proportional pump to the required proportion. Only when the ratio of glue a and glue B reaches the normal value, the following operation can be carried out. 2) Set the selection knob on pump a and pump B, align the glue gun outlet with the middle seam of the two pieces of glass, turn on the glue gun switch, and move the glue gun steadily at an appropriate speed to fill up the two-component glue in the glass tank. Close the glue gun at the end of gluing.
4、更换胶桶:1)当胶桶内的胶用完时,应立即关闭A、B开关,停止打胶。  2)打开A(或B)胶泵充气开关,选择A(或B)胶泵提升机构为上升位置,点动旋钮使压盘慢慢提起,此时应注意:胶桶尽量不要离开底盘,直压盘完全脱离胶桶时关闭A(或B)胶泵的充气开关。  3)撤出空桶,将新胶桶置于工作位置,重复第2、3、项操作。  1、胶枪:因双组份胶是由两种胶混合而成的,其凝固速度与环境温度和A、B胶的比例有关,混合后的胶一般在20分钟之内就会反应固化。所以,当设备在正常打胶后,20分钟之内不使用就须将混合后的胶冲洗出来,以免堵塞混胶器和胶枪。  具体操作:将B泵关闭,打开B胶回流开关然后打开胶枪,胶条为白色即可。
4. Replace the rubber barrel: 1) when the glue in the rubber barrel is used up, the A and B switches should be turned off immediately to stop the glue application. 2) Turn on the inflation switch of a (or b) rubber pump, select the lifting mechanism of a (or b) rubber pump as the rising position, jog the knob to slowly lift the pressure plate. At this time, it should be noted that the rubber barrel should not leave the chassis as far as possible, until the pressure plate is completely separated from the rubber barrel, turn off the inflation switch of a (or b) rubber pump. 3) Withdraw the empty barrel, put the new rubber barrel in the working position, and repeat operations 2,3. 1. Glue gun: because the two-component glue is made by mixing two kinds of glue, its solidification speed is related to the ambient temperature and the ratio of glue a and B. the mixed glue will react and solidify within 20 minutes. Therefore, when the equipment is not used within 20 minutes after normal glue application, the mixed glue must be washed out to avoid blocking the glue mixer and glue gun. Specific operation: turn off pump B, turn on the return switch of adhesive B, and then turn on the glue gun until the adhesive strip is white.

上一篇:双组份打胶机更常见问题的处理方法
下一篇:双组份打胶机设备注油的保养

  • 微信